**City Commission & CRA Meeting Agendas | CLICK HERE**
**For FY2019 Budget Planning Information.  CLICK HERE   |   2018 Hurricane Information.  CLICK HERE**
WPB TO HOST CEREMONIAL RIBBON CUTTING CEREMONY TO CELEBRATE DREHER PARK IMPROVEMENTS

The new playground features a rubber safety surface and a shade covering over the entire structure

Learn More
WPB TO 'READ FOR THE RECORD' ON 10/25

The City encourages residents to take the time that day to read a book aloud to their own children or family members to encourage a love of literacy, books and family together-time

Learn More
ROAD & DOCK CLOSURES UPDATE: WEEK OF OCTOBER 7, 2018
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City
CITY OF WEST PALM BEACH CLOSURES
ENGINEERING
  • Olive Ave. between Clematis St. and Datura St.  (October 9, 2018 through October 10, 2018 9:30 a.m.-4:00 p.m.): Both northbound lanes will be closed for utility pole installation.  Pedestrian access on Olive Ave. west sidewalk.
  • Cumberland Dr. (through January 2019): Reduced speeds on the eastbound and westbound lanes between Military Tr. and Village Blvd. for a road beautification and safety project. Flaggers will assist motorists.
  • Georgia Ave. south of Nottingham Blvd. (until further notice): Full closure for a portion of Georgia Ave. south of Nottingham Blvd. and north of Briggs St. for installation of the drainage system and road reconstruction.
  • Clematis Streetscape Project (through October): 300 block of Clematis St. between S. Olive Ave. and S. Dixie Hwy. is closed to road traffic during construction. Pedestrian traffic will remain unaffected, and businesses will remain open.
  • Briggs and Dobbins Streets (until further notice): Local traffic only between Garden Ave. and Georgia Ave. for stormwater improvements. Eastbound traffic on Briggs St. may turn right only at Georgia Ave. On-street parking is prohibited in the work zone.
 
EVENT CLOSURES
  • Clematis by Night (October 11, 2018, 6:00 p.m. - 10:00 p.m.): Road closures on N. & S. Clematis St. between Narcissus Ave. and Flagler Dr., and Narcissus Ave. between N. Clematis St. and Banyan Blvd.
  • GreenMarket (October 13, 2018, 6:00 a.m.- 3:00 p.m.): Road closures on N. & S. Clematis St. between Narcissus Ave. and Flagler Dr., Narcissus Ave. between Banyan Blvd. and Clematis St., Lantana Ave. between Banyan Blvd. and N. Clematis St.
CLOSURES, REPAIRS FOR CURRIE PARK BOAT RAMPS
  • Full closure: All Currie Park boat ramps at 2400 Flagler Drive are closed for repairs. Ramps will not be accessible during the construction period. Currie Park will remain open from sunrise to sunset.
 
PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS CLOSURES IN CITY OF WPB
  • Jog Rd., north of 45th St., and west of Florida’s Turnpike (until further notice): Periodic southbound lane closures with flaggers controlling traffic for FPL pole replacement.
  • Congress Ave. north of Okeechobee Blvd. to Ware Dr. (periodic northbound and southbound lane closures, one eastbound left turn lane closure): Bridge removal/culvert installation at the “F” Canal.
  • N. Congress Ave. north of Presidential Way to Embassy Dr. (periodic northbound and southbound lane closures until further notice): Water main, driveway and median installation.
  • Roebuck Rd. from Jog Rd. to Haverhill Rd. (periodic lane closures until further notice): Alternating traffic with flaggers controlling traffic for road construction.
  • For more information, contact PBC Engineering & Public Works: (561) 684-4000 or http://discover.pbcgov.org/.
 
FLORIDA DEPT OF TRANSPORTATION (FDOT) CLOSURES IN CITY OF WPB
  • Okeechobee Blvd at the I-95 southbound exit & entrance ramps (Monday October 8, 2018 9:00p.m. -5:00 a.m. Tuesday October 9, 2018) may have one lane closed for repairs.
  • Flagler Memorial Bridge, over the Intracoastal Waterway between the City of West Palm Beach and the Town of Palm Beach (Tuesday October 9, 2018 -Wednesday October 10, 2018 9:00a.m.-3:30 a.m.) will have one lane closed in each direction for bridge inspections.
  • Okeechobee Blvd. from Suwanee Dr.  to just east of Chillingworth Dr. (through Friday, October 12, 2018) will have the outside westbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, for sidewalk repairs.
  • Okeechobee Blvd. from Chillingworth Dr. to Spencer Dr. (Monday, October 1 – Friday, November 2, 2018) will have the outside westbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, for underground wire installation.
 
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed online at http://wpb.org/News-Video/Road-Closure-Updates.