**City Commission & CRA Meeting Agendas | CLICK HERE**
ROAD & DOCK CLOSURES UPDATE: WEEK OF NOVEMBER 11, 2018

City of West Palm Beach Road and Dock Closure Updates are issued weekly

Learn More
RECENT POLICY ACTIONS 11/5/2018

To see items coming up on agendas for future meetings, visit http://wpb.org

Learn More
ROAD & DOCK CLOSURES UPDATE: WEEK OF OCTOBER 28, 2018
City of West Palm Beach Road and Dock Closure Updates are issued weekly
CITY OF WEST PALM BEACH CLOSURES
ENGINEERING
  • Rosemary Ave. between Okeechobee and Hibiscus St. (Monday, October 29, 2018 through Friday, April 12, 2019):  Full closure for CityPlace streetscape improvements. Access to all parking garages will be maintained. Pedestrian traffic will be unaffected.
  • Hibiscus St. between Rosemary Ave. and Quadrille Blvd. (Monday, October 29, 2018 through Saturday, February 23, 2019): Full closure for CityPlace streetscape improvements. Access to all parking garages from Quadrille Blvd. will be maintained. Pedestrian traffic will be unaffected.
  • Spruce Ave. between 31st and 30th  St. (through Tuesday, October 30, 2018): One side of Spruce Ave. will be closed alternately for curb, sidewalk and driveway replacement. Flaggers will assist motorists within the work zone.
  • Cumberland Dr. between Military Tr. And Village Blvd. (through January 2019): Reduced speeds on the eastbound and westbound lanes for a road beautification and safety project. Flaggers will assist motorists.
  • Georgia Ave. between Briggs St. and Dobbins St. (until further notice): Closed for road improvements. Local traffic only.  Eastbound traffic on Briggs St. may turn right only at Georgia Ave.
 
EVENT CLOSURES
  • Making Strides Against Breast Cancer (Saturday, October 27, 2018, 8:00 a.m. – 11:30 a.m.): Flagler Dr. closed between Banyan Blvd. and Actaeon Pl.
  • Moonfest along Clematis and Waterfront Commons (closures begin on Saturday, October 27, 2018):
    • 7:00 a.m.: 400 and 500 blocks of Clematis road closures;
    • 10:00 a.m.: Quadrille Blvd. between and Banyan Blvd. and Datura St. road closures;
    • 12:00 noon: 200 block of Clematis road closures;
    • 3:00 p.m.: 100 block of Clematis, Lantana Ave. between Banyan Blvd. and North Clematis St.  road closures
    • All roads open by 10:00 a.m. Sunday, October 28, 2018.
  • Clematis Streetscape 300 block Grand Reopening (Thursday, November 1, 2018, 5:00 p.m.-9:00 p.m.) Road closures on N. & S. Clematis St. between Narcissus Ave. and Flagler Dr., and Narcissus Ave. between N. Clematis St. and Banyan Blvd.
  • Clematis by Night at Centennial Square (Thursday, November 1, 2018, 6:00 p.m. - 10:00 p.m.): Road closures on N. & S. Clematis St. between Narcissus Ave. and Flagler Dr., and Narcissus Ave. between N. Clematis St. and Banyan Blvd.
  • GreenMarket (Saturday, November 3, 2018, 6:00 a.m.- 3:00 p.m.): Road closures on N. & S. Clematis St. between Narcissus Ave. and Flagler Dr., Narcissus Ave. between Banyan Blvd. and Clematis St., Lantana Ave. between Banyan Blvd. and N. Clematis St.
  • West Palm Beach Antique Flea & Craft Market (Saturday, November 3, 2018, 8:30 a.m.-2:30 p.m.). Road closure in the 300 block of Clematis. 
CLOSURES, REPAIRS FOR CURRIE PARK BOAT RAMPS
  • Full closure: All Currie Park boat ramps at 2400 Flagler Drive are closed for repairs. Ramps will not be accessible during the construction period. Currie Park will remain open from sunrise to sunset.
 
PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS CLOSURES IN CITY OF WPB
  • Jog Rd., north of 45th St., and west of Florida’s Turnpike (until further notice): Periodic southbound lane closures with flaggers controlling traffic for FPL pole replacement.
  • Congress Ave. north of Okeechobee Blvd. to Ware Dr. (periodic northbound and southbound lane closures, one eastbound left turn lane closure): Bridge removal/culvert installation at the “F” Canal.
  • N. Congress Ave. north of Presidential Way to Embassy Dr. (periodic northbound and southbound lane closures until further notice): Water main, driveway and median installation.
  • Roebuck Rd. from Jog Rd. to Haverhill Rd. (periodic lane closures until further notice): Alternating traffic with flaggers controlling traffic for road construction.
  • For more information, contact PBC Engineering & Public Works: (561) 684-4000 or http://discover.pbcgov.org/.
 
FLORIDA DEPT OF TRANSPORTATION (FDOT) CLOSURES IN CITY OF WPB
  • Belvedere Rd., just east of Mercer Ave. at the railroad tracks. (Monday, October 29, 2018 through Friday, November 30, 2018): Two westbound lanes will be closed, 9 p.m. until 5 a.m., Monday night through Friday morning for pole replacement operations. Please note, there will be no work from Nov. 21 – Nov. 25.
  • 45th St. and Australian Ave., at the SFRTA Railroad tracks, and Australian Ave. and Mangonia Dr. (through Friday, November 9, 2018) may have intermittent outside lane closures in each direction, 9 a.m. until 3:30 p.m., Monday through Friday, for FPL pole replacement.
  • Okeechobee Blvd. from Chillingworth Dr. to Spencer Dr. (through Friday, November 2, 2018) will have the outside westbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, for underground wire installation.
  • For more information, contact FDOT: (866) 336-8435 or http://www.fdot.gov/
 
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed online at http://wpb.org/News-Video/Road-Closure-Updates.